Type of Construction: Underground Parking for Office Building |
Scope of Contract: Turnkey construction in top down method |
Gross built area (above ground/ below ground): GBAunderground = 8295sqm; GBAabove =90sqm; 357 parking lots |
Number of Floors: 3 Basements + GF |
Type of Structure: Reinforced concrete structure; masonry interior partitioning |
Façade: Aluminum curtain wall with integrated doors |
Windows and Doors: Metallic fire resistant doors |
Finishing: Epoxy floor coating, asphalt, ceramic tiles, concrete pavement |
Technical Building Equipment’s: Led Lights, sprinkle system, fire detection |
Stage: Finalized March 2020 |
Official project website: www.anatower.ro |

Recent Comments